Project Menu | ||
| Retail | Office | Industrial |
| Residential | Government | Zoning/Planning |
| Landscape Architecture | GIS Consulting | Conceptual Renderings |
Warehouse and Distribution
The Formosa Industrial Park is made up of 129 acres of light industrial zoned property located on Lee Road and Alico Road in the South Fort Myers industrial area east of I-75 and west of US 41. QAI was hired by Alico Road Business Park to design a backbone stormwater management system to comply with the zoning requirement therefore allowing the 129 acres to be platted and developed. The stormwater management system consists of four interconnected lakes discharging into the Fiddlesticks canal. The existing onsite wetlands were provided with recharge trenches to insure preservation. After platting, each of the 10 acre tracts were permitted and developed.
Client
InformationMr. Bjorn Rosinus
Alico Road Business Park, LP
26811 South Bay Drive, Suite 350
The Promenade
Fort Myers, FL 34134
239.949.0990
bjrosinus@alicobizpark.com
Significant Services performed as part of the project:● Lee County Development Order ● Acquiring a SFWMD Environmental Resource Permit ● HRS & FDEP utility permitting due to onsite lift station and water line extension ● Post design and inspection services |
Project Fact Sheet |
|
|
● Starting & Ending Dates: |
6/2006 – 3/2008 |
|
● Total Project Budget: |
$119,000 |
|
● Size of Project: |
129 acres |
Warehouse and Distribution
QAI was hired as a repeat client by Fire Service, Inc., to engineer this 3 building complex in the Southwest International Commerce Center Industrial Park. This 12.85 acre site consists of two satellite distribution buildings totaling 121,000 square feet and a 2 story 15,000 square foot office which will house the Fire Service business in the near future.
The site had to be designed to
accommodate the semi truck traffic that is produced by such
a facility. Both of the large industrial buildings are dock
high buildings which
required
a unique grading design to insure proper drainage. All
design was performed to Lee County standards.
Mr. William Maute
3120 Winkler Ave Ext
Fort Myers, FL 33912
239.936.1033
Significant Services performed as part of the project:● Lee County Development Order ● Acquiring a SFWMD Environmental Resource Permit Modification ● FAA permit required due to proximity to Page Field airport ● HRS & FDEP utility permitting due to onsite lift station and water line extension ● Post design and inspection services |
Project Fact Sheet |
|
|
● Starting & Ending Dates: |
10/2005 – 3/2008 |
|
● Total Project Budget: |
$38,800 |
|
● Size of Project: |
12.85 Acres |
Warehouse and Distribution
ADS – ADSystems a leading manufacturer of digital signs retained Q&A’s services to construct their new 27,000 2-story assembly and office building along with a additional 50,000 SF satellite distribution warehouse. This site is 6.55 AC located in the Southwest International Commerce Park. All permitting was done through Lee County.
_web.jpg)
Mr. Jim Thomas
ADSytems
10030 Amberwood Lane
Fort Myers, FL 33913
239.939.7440
Significant Services performed as part of the project:● Lee County Development Order ● Acquiring a SFWMD Environmental Resource Permit ● FAA permit required due to proximity to Page Field airport ● HRS & FDEP utility permitting due to onsite lift station and water line extension ● Post design and inspection services |
Project Fact Sheet |
|
|
● Starting & Ending Dates: |
10/2005 – 2/2008 |
|
● Total Project Budget: |
$42,180 |
|
● Size of Project: |
6.55 Acres |
Retail, Warehouse and Distribution Center
In January 2002, QAI was engaged by
Eaglecrest Construction, Inc. in a design-build effort on
behalf of City Mattress, Inc. City Mattress’ colossal
growth has created a need for a major regional distribution
center in Southwest Florida, specifically on Bonita Beach
Road, just east of I-75. The site, 5 acres of agricultural
land, was ideally located for the 61,000 square foot
building and operations. The site had many design
challenges
requiring creative engineering. One example includes the
design of a bypass system for off-site stormwater flows that
had historically bisected the site.
Mr. Larry Enck, President
Eaglecrest Construction, Inc.
6150 Diamond Centre Ct
Fort Myers, FL 33912-4365
239.561.9977
enck12100@msn.com
Significant Services performed as part of the project:● FEMA Conditional Letter of Map Revision ● Rezoning the site from agricultural land to light industrial ● Hydrologic and hydraulic analysis for the basin and designed a conveyance system around the site for 25 year, 3 day storm events ● Acquiring a site development order from the City of Bonita Springs ● Acquiring a SFWMD Environmental Resource Permit (with District Board approval) ● Designing a water main extension, lift station and sanitary force main ● Designing a left-turn lane on Bonita Beach Road in accordance with FDOT requirements ● Post design and inspection services |
Project Fact Sheet |
|
|
● Starting & Ending Dates: |
1/2004 through ongoing |
|
● Total Project Budget: |
$49,990 |
|
● Schedule of Project: |
Due to the substantial number of development reviews received by Bonita Springs and Lee County, the turn-a-round time was extended by 3-months |
|
● Size of Project: |
5 Acres |

Mini-Warehouse | Road Design
QAI was hired by ASAP Storage, Inc to design and permit a 7-acre storage facility with a ¼ mile extension of Indian Paint Lane (south of Daniels Road, west of I-75). During construction, QAI is providing CEI services to the contractor. The project is located within the secondary protection zone for the protected Bald Eagle. The QAI Team was successful in developing a Bald Eagle Management Plan that balances construction with habitat protection. The site design includes over 130,000 square feet of storage space and serves approximately 325 vehicle trips per day. The extension of Indian Paint Lane required the design of a two lane roadway, water main, and force main within a 60-foot right-of-way. The roadway and associated infrastructure was designed and permitted to Lee County specifications.
Mr. Anthony Santaularia
Diversified Concepts, LLC
P.O. Box 1753
Lawrence, KS 66044
785.749.0000
anthony@dconcepts.biz
Services performed as part of the project:● Lee County Development Order ● Bald Eagle Management Plan ● Extension of Indian Paint Lane |
Project Fact Sheet |
|
|
● Starting & Ending Dates: |
6/2005 through 5/2006 |
|
● Total Project Budget: |
$64,200 |
|
● Schedule of Project: |
Project delivered on-time and on budget |
|
● Size of Project: |
7 Acres |
Industrial, Warehouse and Distribution
80 Acres (Industrial Lots & 1 MF Tract) - City of Fort Myers
o Site Design and Rezoning Services
o Subdivision Road, Utility and Infrastructure Design
o Site and Utility Permitting
o Construction Inspections
o Project Closeout and Final Certification
Industrial, Warehouse and Distribution
o Site Design
o Subdivision Road, Utility and Infrastructure Design
o Site and Utility Permitting
o Construction Inspections (Pending project funding)
o Project Closeout and Final Certification (Pending)